Investigations
Return to main page > Investigations

Railway level crossings, Peterborough

We were asked by the Ergonomist CCD to assist them in part of their investigation into the operation of remotely controlled level crossings. Our part of the project was to examine the lighting in the gate control boxes and to survey the levels and distribution of the light across the level crossings themselves. This was used to help determine the visibility of the images on CCTV screens.

Return to main page > Investigations